This report is one of a series of reports documenting the methods and findings of a multi-year, multi-disciplinary project coordinated by the Pacific Earthquake Engineering Research Center (PEER) and funded by the California Earthquake Authority (CEA). The overall project is titled “Quantifying the Performance of Retrofit of Cripple Walls and Sill Anchorage in Single-Family Wood-Frame Buildings,” henceforth referred to as the “PEER-CEA Project.”
The overall objective of the PEER–CEA project is to provide scientifically based information (e.g., testing, analysis, and resulting loss models) that measure and assess the effectiveness of seismic retrofit to reduce the risk of damage and associated losses (repair costs) of wood-frame houses with cripple wall and sill anchorage deficiencies as well as retrofitted conditions that address those deficiencies. Tasks that support and inform the loss-modeling effort are: (1) collecting and summarizing existing information and results of previous research on the performance of wood-frame houses; (2) identifying construction features to characterize alternative variants of wood-frame houses; (3) characterizing earthquake hazard and ground motions at representative sites in California; (4) developing cyclic loading protocols and conducting laboratory tests of cripple wall panels, wood-frame wall subassemblies, and sill anchorages to measure and document their response (strength and stiffness) under cyclic loading; and (5) the computer modeling, simulations, and the development of loss models as informed by a workshop with claims adjustors.
This report is a product of Working Group 7: Reporting and is a summary of the PEER–CEA Project work performed by Working Groups 1–6. This report does not present new information apart from the rest of the project, and its purpose is to serve as a reference for researchers and catastrophe modelers wishing to understand the objectives and key findings of the project. The key overall findings of the PEER–CEA Project are summarized in Chapters 8 and 10, which describe the efforts of the WG5 and WG6 Working Groups. The reader is referred to the individual reports prepared by the Working Groups for comprehensive information on the tasks, methodologies, and results of each.
Full List of PEER Reports: click here.